insulationdiagnostics.com
ACTIVITIES: Measuring Systems Instrument Sales Diagnostics Control Engineering Events News About Us Contact Support Forum Site Index
E-mail Address: Password:
Registration
Forgot your password?
15th Conference on High Voltage Insulation Diagnostics - 2015

28-30 October 2015.
The choice of location is in progress.


We organize the 15th Conference on High Voltage Insulation Diagnostics between 28-30 October 2015.

More...
CONSTRUCTION OF TEST LABORATORIES
OUR CORE ACTIVITY: CONSTRUCTION OF TEST LABORATORIES

From the detailed design to the final realization

Basic requirement of the customers of manufacturers is to be ensured by proved and precisely documented methods that the products under procurement are satisfying the requirements of the planning parameters and industrial standards. That is why the test laboratory is one of the most important parts of a factory. From this reason the basic interest of the manufacturers is to be able to produce the necessary measurements with high reliability and effectiveness in safe and automated measuring environment to increase the productivity and to promote the quality management. Diagnostics Ltd already has high competence in construction of complete test laboratories including the conceptual and detailed design, the whole controlling, data evaluating and management system to achieve the aims above.

References: TRANSFORMER TEST STATIONS.

The range of our reference:

  • Power range of transformers 63 ÷ 5000 kVA
  • Range of high voltage winding 3000 ÷ 36000 V
  • Range of low voltage winding 220 ÷ 6600 V
  • Range of insulations paper-oil or cast-resin
  • Range of frequency 50 and 60 Hz.

A POSSIBLE LAYOUT OF TEST AREAS

  • Low Voltage Test Area
    • Turns ratio and winding resistance measurements
    • Insulation resistance tests
  • Routine Test Area
    • Applied HV withstand tests
    • Induced HV withstand tests
    • Load loss and short circuit impedance measurements
    • No-load loss measurements
    • Zero order impedance tests
  • Heat Run Test Area
    • No-load loss, load loss and winding resistance measurement
  • PD and Noise Test Area
    • Specially designed cabin with noise suppression wall cover for noise level measurements and with electrical shielding in order to remain under the 2pC PD noise level for measuring cast resin transformers
    • The noise and PD cabin can be separated in different rooms according the user’s needs 
More...
Links
Our Hungarian Privacy Statement
Privacy contact: adatvedelem@diagnostics.hu
More...